Prepare the list of items to be executed with units for detailed estimate of a given structure from the given drawing.
Prepare a report on market rates for given material, labour wages, hire chargesof tools & equipment required to construct the given structure as mentioned in at Serial number 1 above.
Study of items with specification given in the PWD Schedule of Rates. (for any ten item)
Recording in Measurement Book (MB) for any four items
Prepare bill of quantities of given item from actual measurements. (any four items).
Prepare approximate estimate for the given civil engineering works for buildings, road and culvert.
Prepare detailed estimate from the given set of drawings using 'standard measurement and abstract format' for ( G+1), 2 BHK RCC framed structure Residential Building using description of item from PWD Schedule of Rates along with face sheet and prepare quarry chart, lead statement.
Prepare detailed estimate from the given set of drawings of Door(panelled door)and Window(partly glazed) - frame and shutter [ wooden]
Calculate the reinforcement quantities from the given set of drawings for a room size of 3 m X 4 m with bar bending schedule (footing, column, beam, lintel with chajja, slab)
Prepare rate analysis for the given five item of works.
Prepare detailed estimate of road of one kilometre length from the given drawing.
Prepare detailed estimate of small Septic tank from the given set of drawings.
Prepare detailed estimate of Tube well with Hand pump from the given set of drawing.
Assess the valuation of an old building from the given drawing by any one method.
Prepare detailed estimate for a two lane bituminous road and culvert (slab type)
methods of stack measurement at site for stone chips etc